Cummins N14 STC, Celect, Celect Plus – Service Manual 010-033   Turbocharger

Table of Contents

Install

Install

TOC

Apply a film of high-temperature anti-seize compound, Part Number 3823097, or equivalent, onto the turbocharger mounting studs.

 
SMALL | MEDIUM | LARGE


Install a new mounting gasket, the turbocharger, and the four mounting nuts.

Tighten the mounting nuts.

Torque Value:  68  n.m  [50 ft-lb]

SMALL | MEDIUM | LARGE
   


Install the discharge elbow and clamp onto the charge air cooler pipe connection.

NOTE: Do not tighten the clamp until the elbow is installed on the turbocharger.

SMALL | MEDIUM | LARGE
   


Install a new o-ring seal, the clamp, and the discharge elbow to the turbocharger.

Tighten the clamps.

Torque Value:  8.5  n.m  [75 in-lb]

SMALL | MEDIUM | LARGE
   


Install a new gasket, oil drain tube, optional bracket and capscrews.

Tighten the capscrews.

Torque Value:  44  n.m  [32 ft-lb]

SMALL | MEDIUM | LARGE
   


Pour 50 to 60 cc [2.0 to 3.0 oz] of clean engine oil into the turbocharger oil supply opening.

SMALL | MEDIUM | LARGE
   


 CAUTION 

Proper routing of the turbocharger oil supply tube is critical to avoid failure. Avoid any tube-to-metal contact. The inlet supply fitting must be oriented slightly off-vertical to allow proper alignment.

If installing a new turbocharger, install the male union elbow.

Install the turbocharger oil supply tube on the elbow.

Torque Value:  30  n.m  [22 ft-lb]

SMALL | MEDIUM | LARGE
   


Install the intake and exhaust pipes to the turbocharger, and tighten the clamps.

Torque Value:  8.5  n.m  [75 in-lb]

Operate the engine, and check for air and oil leaks.

SMALL | MEDIUM | LARGE
Last Modified:  09-Sep-2011