ISM, ISMe, and QSM11 – 011-019   EGR Cooler

Install

TOC

Automotive with CM875, CM870 and CM570


Loosely install the bottom two mounting capscrews and install the EGR cooler onto them.

Install the top three capscrews and tighten all five capscrews.

Torque Value:  20  n.m  [177 in-lb]

Install a new EGR cooler connection gasket with the adhesive side on the piloted end of the EGR cooler connection, where it connects with the EGR valve.

SMALL | MEDIUM | LARGE


Before installing the V-band clamp, coat the clamping surface with high temperature anti-seize compound.

SMALL | MEDIUM | LARGE
   


Install the V-band clamps between the EGR valve and EGR cooler connection.

SMALL | MEDIUM | LARGE
   


Tighten the V-band clamp between the EGR cooler connection and the EGR valve.

Torque Value:  17  n.m  [150 in-lb]

SMALL | MEDIUM | LARGE
   

Automotive with CM876


Remove any protective caps or heavy tape.

Loosely install the bottom two mounting capscrews and install the EGR cooler onto them.

Install the top three capscrews and tighten all five capscrews.

Torque Value:  20  n.m  [177 in-lb]

Install new EGR cooler connection gaskets with the adhesive side on the piloted end of each joint.

SMALL | MEDIUM | LARGE
   


Before installing the V-band clamp, coat the clamping surface with high temperature anti-seize compound.

SMALL | MEDIUM | LARGE
   


Install the v-band clamps between the EGR valve and EGR cooler.

SMALL | MEDIUM | LARGE
   


Tighten the v-band clamps.

Torque Value:  17  n.m  [150 in-lb]

SMALL | MEDIUM | LARGE
Last Modified:  29-Apr-2009