ISC, ISCe, QSC8.3, ISL, ISLe3, ISLe4 and QSL9 Engines – 005-081   Snubber, Rate Shape

Preparatory Steps

TOC

 WARNING 

When using solvents, acids, or alkaline materials for cleaning, follow the manufacturer’s recommendations for use. Wear goggles and protective clothing to reduce the possibility of personal injury.
 WARNING 

Some solvents are flammable and toxic. Read the manufacturer’s instructions before using.
 WARNING 

Wear appropriate eye and face protection when using compressed air. Flying debris and dirt can cause personal injury.

Thoroughly steam-clean the rate shape tube and fuel pump area.

Dry with compressed air.

Remove the rate shape tube assembly. Refer to Procedure 005-090.

 
SMALL | MEDIUM | LARGE

Remove

TOC

Remove the rate shape snubber assembly.

Use a center punch to pry the seal disc from the accumulator.

SMALL | MEDIUM | LARGE
   

Inspect for Reuse

TOC

The parts in the assembly are as shown:

  1. Snubber valve seat
  2. Spring
  3. Rate shape snubber body
  4. Seal disc
  5. Snubber valve
  6. Spring post.

Replace the snubber assembly if the snubber spring is broken.

Do not reuse snubber seal discs.

SMALL | MEDIUM | LARGE
   


Early design snubber valves are not reusable.

  1. Part Number 3800351, first snubber valve assembly released for CAPS (one groove, not reusable)
  2. Part Number 3800764, second snubber valve assembly released for CAPS (two grooves, not reusable)
  3. Part Number 4010544, current snubber valve assembly released for CAPS (no grooves, may be reused); always replace the seal disk.
 
SMALL | MEDIUM | LARGE
   

Install

TOC

Clean the bore for the distributor outlet fitting with QD cleaner prior to installation of the new snubber assembly.

Install a new seal disc into the accumulator.

SMALL | MEDIUM | LARGE
   


Apply lubricating oil to the face of the snubber seat and to the face and threads of the snubber fitting.

SMALL | MEDIUM | LARGE
   


Install the snubber assembly.

Torque Value: Step 1 14 n.m   [124 in-lb]
  Step 2 Rotate 80 degrees

SMALL | MEDIUM | LARGE
   

Finishing Steps

TOC

Install the rate shape tube assembly. Refer to Procedure 005-090.

Operate the engine and check for leaks.

 
SMALL | MEDIUM | LARGE
Last Modified:  17-Jun-2003