B5.9G, B5.9LPG – Troubleshooting and Repair Manual – 010-033   Turbocharger

Preparatory Steps

TOC

  • Remove the air crossover tube, if used.
  • Disconnect the charge air cooler hose.
  • Disconnect the boost capsule actuator hose.
  • Disconnect the intake and exhaust piping.
 
SMALL | MEDIUM | LARGE

Remove

TOC

Disconnect the exhaust and charge air cooler piping.

SMALL | MEDIUM | LARGE
   


Drain the engine coolant and disconnect the turbocharger coolant lines.

SMALL | MEDIUM | LARGE
   


Remove the capscrews from the oil drain tube.

SMALL | MEDIUM | LARGE
   


Disconnect the oil supply line.

NOTE: Engines built after June 1993 may use a copper washer in both ends of the turbocharger lubricating oil supply line. The washer should be replaced
whenever the line is removed.

SMALL | MEDIUM | LARGE
   


Remove the intake manifold pressure supply line from the wastegate actuator.

SMALL | MEDIUM | LARGE
   


Remove the turbocharger and gasket.

SMALL | MEDIUM | LARGE
   

Inspect for Reuse

TOC

Clean the sealing surface. Inspect the sealing surface and mounting studs for damage.

SMALL | MEDIUM | LARGE
   


NOTE: If the turbocharger is not to be immediately replaced, cover the opening to prevent any material from falling into the manifold.

Inspect turbocharger wastegate linkage, valve shaft, module, and pressure signal line.

Visually inspect the turbocharger impeller blades for damage. If the impeller is damaged, inspect the intake piping and filter element for damage.

Check or calibrate wastegate. Refer to Procedure 010-050 or refer to the Turbocharger Shop Manual, Bulletin Number 3810321.

SMALL | MEDIUM | LARGE
   

Install

TOC

Install a new gasket, and apply anti-seize compound to the mounting studs.

NOTE: Use only lead-free anti-seize compound compatible with oxygen sensors.

SMALL | MEDIUM | LARGE
   


Install the turbocharger.

Torque Value:  45  n.m  [33 ft-lb]

SMALL | MEDIUM | LARGE
   


Use a new gasket and connect the oil drain tube.

Torque Value:  24  n.m  [18 ft-lb]

SMALL | MEDIUM | LARGE
   


Use a new gasket and connect the oil drain tube.

Torque Value:  24  n.m  [18 ft-lb]

SMALL | MEDIUM | LARGE
   


 CAUTION 

Lubricating oil is vital to the turbocharger life; therefore, clean engine oil must be added through the oil supply fitting anytime a new turbocharger is installed.

NOTE: New turbochargers must be prelubricated before start-up.

Pour 50 to 60 cc [2 to 3 oz] of clean engine oil into the oil supply fitting. Rotate the turbine wheel to allow the oil to enter the bearing housing.

SMALL | MEDIUM | LARGE
   


Connect the oil supply line.

Torque Value:  35  n.m  [26 ft-lb]

SMALL | MEDIUM | LARGE
   


If required, loosen the snap ring and align the compressor housing with the turbocharger air outlet connection.

SMALL | MEDIUM | LARGE
   


Install the wastegate actuator capsule actuator hose.

SMALL | MEDIUM | LARGE
   


Install charged air cooler hose.

Install the air inlet and exhaust piping.

Torque Value:  8  n.m  [72 in-lb]

Fill the cooling system. Refer to Procedure 008-018.

Operate the engine and check for leaks.

SMALL | MEDIUM | LARGE
Last Modified:  27-Jun-2002