M11 Series – Service Manual – 014-009   Engine Testing (Portable Dynamometer or Load Bank)

Table of Contents

General Information

General Information

TOC

When it is

not possible to load an engine immediately after rebuild or repair (example: on-highway tractor that

must
be “bobtailed” for delivery, a standby generator or fire pump that can

not be operated because of customer restrictions, a fire truck that can

not be loaded with the water pump, and so forth), the engine

must be run-in on a chassis dynamometer, portable dynamometer, or load bank following the recommendations outlined in the preceding procedures.

 
SMALL | MEDIUM | LARGE
Last Modified:  07-May-2003