B5.9G, B5.9LPG – Troubleshooting and Repair Manual – 011-007   Exhaust Manifold, Dry

Preparatory Steps

TOC

  • Remove the turbocharger. Refer to Procedure 010-033-002.
 
SMALL | MEDIUM | LARGE

Remove

TOC

13 mm

Remove the heat shield.

SMALL | MEDIUM | LARGE
   


15 mm

Remove the exhaust manifold and gaskets.

SMALL | MEDIUM | LARGE
   

Clean

TOC

Clean the sealing surfaces.

SMALL | MEDIUM | LARGE
   

Inspect for Reuse

TOC

Inspect the exhaust manifold for cracks, burnout, or damaged threads.

SMALL | MEDIUM | LARGE
   

Install

TOC

Coat all capscrew threads with an unleaded anti-seize compound.

NOTE: Use only anti-seize compound compatible with oxygen sensors.

 
SMALL | MEDIUM | LARGE
   


15 mm

Install the exhaust manifold and new gaskets.

Torque Value:  43  n.m  [32 ft-lb]

Follow the tightening sequence shown in the illustration.

SMALL | MEDIUM | LARGE
   


 CAUTION 

The system must be filled slowly to prevent air locks. During filling, air must be vented from the engine coolant passages. The system has a maximum fill rate of 14 liters per minute [3.5 gallons per minute]. Do not exceed this fill rate. Wait 2 to 3 minutes to allow air to be vented. Then add coolant to bring the level to the top.

Install the heat shield and turbocharger. Fill the engine with coolant.

SMALL | MEDIUM | LARGE
   


Operate the engine, and check for leaks.

 
SMALL | MEDIUM | LARGE
Last Modified:  27-Jun-2002