Remove the air crossover tube. Refer to Procedure 010-019.
Disconnect the air inlet connection, if equipped. Refer to Procedure 010-022.
Remove the air intake connection. Refer to Procedure 010-080.
Remove the injector supply lines, if required. Refer to Procedure 006-051.
Remove the turbocharger control valve, if equipped. Refer to Procedure 019-388 in Troubleshooting and Repair Manual, CM870 Electronic Control System, ISC and ISL Engines, Bulletin 4021416.
Install the grid heater, if equipped. Refer to Procedure 010-029.
Install the injector supply lines, if removed. Refer to Procedure 006-051.
Install the air intake connection. Refer to Procedure 010-080.
Install the air inlet connection, if used. Refer to Procedure 010-022.
Install the turbocharger control valve, if equipped. Refer to Procedure 019-388 in Troubleshooting and Repair Manual, CM870 Electronic Control System, ISC and ISL Engines, Bulletin 4021416.
Install the air crossover tube. Refer to Procedure 010-019.
Hello, I'm Jack, a diesel engine fan and a blogger. I write about how to fix and improve diesel engines, from cars to trucks to generators. I also review the newest models and innovations in the diesel market. If you are interested in learning more about diesel engines, check out my blog and leave your feedback.
View all posts by Jack